Type of Sheet Pile stacking

When stacking piles on site it is recommended that they are placed on timber or steel spacers, to allow belt or chains to be placed around the bundles, and on a level surface to prevent the piles being distraction from his actual shape. The spacers should be placed at regular intervals up to 4 m apart along the length of the piles and it is recommended that the overhang is limited p to 1.5 m. It is recommended that pile bundles are stacked not more than 4 no’s to prevent excessive loads on below pile bundles and surface land.

Bundles should ideally be staggered in plan, which we show in  images.